Platform
The
Asabo complex consists of three bridge-linked structures,
a Quarters Platform (QP), a Gas Injection Platform (GIP)
and a Production Platform (PP).
Challenge
MSL
was commissioned to assess the ability of the topsides
structures of the three platforms to support and withstand
blast loads. Further, the study was aimed at recommending
remedial measures to enable the topsides of all three
structures to resist these loads and definition of
load-mitigation measures.
MSL
Scope
MSL’s
scope of activities were sub-divided into three Phases:
-
Phase
1 consisted of blast response analyses for the
topsides of the GIP platform and an assessment of
options for strengthening or replacing existing fire
walls.
-
Phase
2 consisted of the analysis of options to mitigate the
explosion loads on the primary framing of the three
platforms and, in particular, by the replacement of
deck plates with grating.
-
Phase
3 related to the detailed design of blast walls and
preferred strengthening schemes suggested by the
results of Phases 1 and 2.
Benefits
Substantial
cost benefits were delivered without compromising safety through judicious
use of mitigating measures such as replacement of deck plate with grating.
The study was concluded within a timeframe consistent with the planned
maintenance schedules for the platforms.
|